KastKing Saltwater & Freshwater Fishing Rod, Powerful, Lightweight S-Curve Graphite Rod Blanks, Nano Resin Technology,-Kong

★★★★★ 4.9 149 reviews

$71.99
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by bydbipopasarminggu.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$71.99
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jun 28
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by bydbipopasarminggu.com
Free 30-day returns Details

Product details

Management number 230595997 Release Date 2026/06/18 List Price $28.80 Model Number 230595997
Category

<p>About this item<br>Powerful S-Curve Graphite Rod Blanks - KastKing KONG series rods are designed for anglers targeting massive fish in fresh and saltwater! These lightweight, powerful, 100% graphite blanks are made of high-strength S-Curve graphite reinforced with Nano-Resin technology that delivers amazing strength and lifting power but are still incredibly light and sensitive.<br>Stainless-Steel Double Foot Guides – Because KastKing KONG rods are made to handle giant fish, every component must be up to the challenge. We use only stainless-steel, double foot guides because of their strength and each guide has an ultra-smooth Titanium Oxide ring which is designed to perform flawlessly with heavy braided line. The combination of strong frames and durable rings are perfect for extreme conditions.<br>High-Strength Components – When targeting big fish, every component must be up to the challenge. We use extra strong graphite reel seats with nylon reinforcement to ensure that large reels stay secure. Custom handles feature an EVA core for comfort and a rubber cross wrap for durability. Foregrips have a spiral cross wrap with finger slots that provide control over big fish. Some models also include graphite gimbals in the fighting butt.<br>Chartreuse “Strike Tip”- The bright chartreuse “Strike Tip” enhances early strike detection even in low light conditions and quickly alerts you to even the lightest bites, so you never miss a fish. The “Strike Tips” are also great for night fishing but equally well in bright sunlight.<br>Casting and Spinning Models – KastKing KONG Rods are available in both Casting and Spinning models in both 1 and 2 pc. Line ratings range from 15-40 lbs. for the 7’6” spinning model all the way to 50-100 lbs. for the 6’6” 1 pc casting rod. Lure ratings range from 2-8 oz to 8-32 oz. If you are targeting big fish in fresh or saltwater, there is a KastKing KONG rod that will get the job done for you.</p>

  • Powerful S-Curve Graphite Rod Blanks - KastKing KONG series rods are designed for anglers targeting massive fish in fresh and saltwater! These lightweight, powerful, 100% graphite blanks are made of high-strength S-Curve graphite reinforced with Nano-Resin technology that delivers amazing strength and lifting power but are still incredibly light and sensitive.
  • Stainless-Steel Double Foot Guides – Because KastKing KONG rods are made to handle giant fish, every component must be up to the challenge. We use only stainless-steel, double foot guides because of their strength and each guide has an ultra-smooth Titanium Oxide ring which is designed to perform flawlessly with heavy braided line. The combination of strong frames and durable rings are perfect for extreme conditions.
  • High-Strength Components – When targeting big fish, every component must be up to the challenge. We use extra strong graphite reel seats with nylon reinforcement to ensure that large reels stay secure. Custom handles feature an EVA core for comfort and a rubber cross wrap for durability. Foregrips have a spiral cross wrap with finger slots that provide control over big fish. Some models also include graphite gimbals in the fighting butt.
  • Chartreuse “Strike Tip”- The bright chartreuse “Strike Tip” enhances early strike detection even in low light conditions and quickly alerts you to even the lightest bites, so you never miss a fish. The “Strike Tips” are also great for night fishing but equally well in bright sunlight.
  • Casting and Spinning Models – KastKing KONG Rods are available in both Casting and Spinning models in both 1 and 2 pc. Line ratings range from 15-40 lbs. for the 7’6” spinning model all the way to 50-100 lbs. for the 6’6” 1 pc casting rod. Lure ratings range from 2-8 oz to 8-32 oz. If you are targeting big fish in fresh or saltwater, there is a KastKing KONG rod that will get the job done for you.
Brand KastKing
Fishing rod type Fishing Rod
Fishing rod material Graphite
Handle material EVA, Rubber
Pieces 1
Fishing location Saltwater, Freshwater
Features Lightweight
Color A: Spin 7'6"/Mh Power/Fast(2pcs)
Model KONG
Material Graphite

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.9 out of 5
★★★★★
149 ratings | 61 reviews
How item rating is calculated
View all reviews
5 stars
89% (133)
4 stars
1% (1)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (15)
Sort by

There are currently no written reviews for this product.